First,
the Beams have to be fixed. Beams were fixed (including stirrups, Tension bars,
space bars and etc.)
- After beam reinforcements were placed slab reinforcement was fixed.
- Placing reinforcements was done according to Bottom 1 and bottom 2 patterns. The short side of the panel was taken as bottom layer 1 and the other side was taken as the bottom layer
- Always the pattern was carried bottom layer 2 was laid over bottom layer 1.
- Then, the distribution bars and the top layers were fixed. Then the conduit was laid on the slab formwork according to the drawing.
- The covering blocks were placed under the bottom layer. 20mm covering blocks were used for every one square meter.